Study on the application of construction project cost control in China
Abstract
Project cost control is a hot issue in construction enterprise management and a key factor to determine the return on project investment. With the continuous summary of modern project management experience, systematic, comprehensive and dynamic management methods and ideas gradually began to be adopted. As a controllable system, cost system is the key to determine the market competitiveness of construction enterprises. This paper combines qualitative research with quantitative research, normative research with empirical research, theoretical research with practical research, and makes comprehensive use of previous research results to provide guidance for the practical operation of cost control in construction enterprises. Firstly, it introduces the important factors affecting the cost and the background and purpose of the project cost control, and then analyzes the object and content of the project cost control and analysis. Finally, the phenomenon of "three super" and the deviation of the project cost are analyzedd and discussed. It is of great practical significance to study project cost control for promoting the reform of investment system and improving market competitiveness of construction enterprises.
References
- BIM Appliction Standard 2007 Based on IFC Standard published by the US National Institute of Building Sciences.
- Li J 2009 Research on Key Technologies of Concrete Structure 100 Year Durabiliity of the National Stadium for Beijing 2008 Olympic Games Proc.of Shanghai Int. Conf. on Technology of Architecture and Stucture p 68.
- Ma Z,Li H and Yang J 2014 Using XML to support information exchange in construction projects Autom. Constr. 12 pp 491-506.
- Linderoth H 2010 Understanding Adoption and Use of BIM As the Creation of Actor Net works Autom. Constr. pp 66-72.
- Eastman C, Teicholz P and Sacks R et al. 2000 BIM handbook New Jersey ohnWiley &Sons.
- Zhang J and Hu Z 2011 BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:principles and methodologies Autom. Constr. pp 155-166.
- Li Y, Lang H and Wu T 2013 Project Quality Management Based on Building Information Modeling Construction technology Technology 10(1) p 20-23.
- YA and K 2011 Technology adoption in the BIM implementation for lean architectural practice Autom. Constr. pp 189-195.
- Smith D and Tardiff M 2009 Building Information Modelling: a Strategic Implementation Guide for Architects, Engineers Constructors and Real Estate Asset Managers 25(1) p 99.
- Ding L and Ying Z 2014 Burcu Akinci.Building Information Modeling application framework The process of expanding from 3D to computable Autom. Constr. 24(2) pp 82-93.
- Ma Z,Wei Z and Wu S 2011 Application and extension of the IFC standard in construction cost estimating for tendering in China Autom. Constr. 24(3) pp 96-204.