Research Article

Research on kitting evaluation method of complex electromechanical products

Pengfei Zhao*
Beijing Zongheng Electro-mechanical Technology Co.,Ltd.

* Corresponding author: [email protected]

Abstract

Precise and efficient product kitting evaluations are vital for boosting assembly performance and customer contentment for varied, small-batch, and intricate electromechanical products. However, current enterprise resource planning systems (ERP) provide inadequate support for analyzing the kitting of products. How to evaluate the degree to which customers' demands for a complete set of multiple products can be met when adjusting the importance level of customer demands without changing the customer demand date in the production system and affecting the scheduled customer orders has become one of the urgent problems that enterprises need to solve. In response to the above issues, this article presents a method for evaluating product kitting, which takes the maximum quantity of complete sets of products as the optimization objective, considers multiple constraints such as material inventory data and in process business data, and designs a multi-level BOM decomposition algorithm. Finally, a case study of a company producing core components for standard high-speed trains demonstrates the practicality and efficacy of the proposed method.

Keywords: ERP; restrictions; BOM; kitting
Published: October 23, 2023
DOI: 10.54254/2755-2721/22/20231183
Volume: ACE Vol.22
pp. 112-121
Download PDF

References

  1. YIN Chao, GAN Dewen, LIANG Zhongquan and FEI Yichao 2004 Evaluation and early warning method of key assembly process materialsquality loss for complex electromechanical products.Computer integrated Manufacturing Systems 20(06) 1432-42.
  2. Ronen 1992 The complete kit concept. International Journal of Production Research 30(10) 2457-66.
  3. Hason R, Medbo L, Medbo P 2012 Assembly station design: a quantitative comparison of the effects of kitting and continuous supply. Journal of Manufacturing Technology Management, 23(3) 315-27.
  4. Hason R, Brolin A 2013 A comparison of kitting and continuous supply in in-plant materials supply. International Journal of Production Research 51(4) 979-92.
  5. Croci F, Perono M, Pozzetti A 2000 PCB assembly scheduling through kit concept. Production Planning & Control 11(2) 141-52.
  6. Zhou J, Wang A M, Li Z Y 2014 Incremental material kitting and circulation state management technology in assembly execution process of complex products. Computer Integrated Manufacturing Systems 20(7) 1583-98.
  7. Zhou Binghai, SHEN Chengyi 2018 A new part supply scheduling method of automotive assembly lines based on improved kitting strategy. Systems Engineering Theory and Practice 38(07) 1870-76.
  8. Bortolini M, Faccio M, Gamberi M and Pilati F 2020 Assembly kits with variable part physical attributes: warehouse layout design and assignment procedure. Assembly Automation 40(06) 857-68.
  9. Khajavi S H, Baumers M, Holmström J,Özcan E,Atkin J,Jackson W and Li W 2018 To kit or not to kit: Analysing the value of model-based kitting for additive manufacturing. Computers in Industry 98 100-17.
  10. Bottin M, Faccio M, Minto R and Rosati G 2021 Sales kit automated production: An integrated procedure for setup reduction in case of high products variety. Applied Sciences 11(21) 10110.
  11. Faccio M, Gamberi M, Pilati F and Bortolini M 2015 Packaging strategy definition for sales kits within an assembly system. International Journal of Production Research 53(11) 3288-05.
  12. ZHOU Xiaoye, MA Xiaoyun and ZHU Meilin 2023 Research on optimization of kitting material distribution of mixed-modelassembly line under robot-operator picking environment. Computer integrated Manufacturing Systems 1-17.
  13. LI Sihan, MO Chaoxiong, Liu Jianjun, Chen Qingxin and MAO Ning 2021 Proactive Scheduling of Multi-location Final-assembly Operations with Uncertain Material Kitting Time. Industrial Engineering Journal 24(3) 104-14.
  14. WANG Weiguo, WANG Yao 2013 Research and implement for kit-manufacturing model. Computer integrated Manufacturing Systems 19(11) 2795-801.
  15. LIU Qiong,FAN Zhengwei,ZHANG Chaoyong,ZHU Keren,LIU Weiqi and RAO Yunqing 2014 Resequencing problem of mixed model assembly line caused by material unkitting. Computer integrated Manufacturing Systems 20(7) 1608-14.
  16. ZHOU Shuiyin,CHEN Rongqiu 2005 A Genetic Algorithm:Weighted Single Machine Scheduling Problems to Maximize the Whole-set Orders. Systems Engineering 23(5) 119-22.