Digital Twin-Based Construction Project Management Integrating Progress Monitoring with Safety Control and Resource Coordination
Abstract
Construction projects are characterized by long cycles, numerous stakeholders, and constantly shifting site conditions. Managers need current information on progress, safety, and resource use. Traditional methods fall short in meeting these demands. Data acquisition is slow, multi-source integration is weak, and real-time status updating rarely happens. Digital twin (DT) technology links physical engineering assets to digital models and field data. This linkage provides a way to monitor and manage construction processes dynamically. This paper adopts a literature synthesis approach combined with representative case analysis to examine the technical foundations of DT in construction projects. The work summarizes principal applications from three angles: construction progress monitoring, construction safety control, and construction resource coordination. Existing applications show that DT can link building information modeling (BIM) models, sensor data, unmanned aerial vehicle (UAV) imagery, and equipment operation data to actual site conditions. This supports progress deviation identification, safety risk assessment, and resource utilization monitoring. Notably, different scenarios impose different requirements on data types, collection frequency, and model updating methods. Practical applications also face constraints. Data quality, system integration, implementation cost, and continuous model updating are all critical factors. DT in construction projects must be configured to specific management demands and site conditions. Only then does it enhance practical applicability in construction management.
References
- Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020). Construction with digital twin information systems.Data-Centric Engineering, 1, e14. https://doi.org/10.1017/dce.2020.16
- Deng, M., Menassa, C. C., & Kamat, V. R. (2021). From BIM to digital twins: A systematic review of the evolution of intelligent building representations in the AEC-FM industry.Journal of Information Technology in Construction, 26, 58-83. https://doi.org/10.36680/j.itcon.2021.005
- Pan, Y., & Zhang, L. (2021). A BIM-data mining integrated digital twin framework for advanced project management.Automation in Construction, 124, 103564. https://doi.org/10.1016/j.autcon.2021.103564
- Xie, X., Deng, L., Xiao, M., Luo, H., & Fang, R. (2021). New-generation quality and safety management of the construction industry.Chinese Journal of Engineering Science, 23(4), 71-78. https://doi.org/10.15302/j-sscae-2021.04.008
- Opoku, D.-G. J., Perera, S., Osei-Kyei, R., & Rashidi, M. (2021). Digital twin application in the construction industry: A literature review.Journal of Building Engineering, 40, 102726. https://doi.org/10.1016/j.jobe.2021.102726
- Zhang, J., Cheng, J. C. P., Chen, W., & Chen, K. (2022). Digital twins for construction sites: Concepts, LoD definition, and applications.Journal of Management in Engineering, 38(2), 04021094. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000948
- Khajavi, S. H., Tetik, M., Liu, Z., Korhonen, P., & Holmström, J. (2023). Digital twin for safety and security: Perspectives on building lifecycle.IEEE Access, 11, 52339-52356. https://doi.org/10.1109/ACCESS.2023.3278267
- Elghaish, F., Mohandes, S. R., Rahimian, F., Abrishami, S., & Hosseini, M. R. (2026). Predictive digital monitoring of construction resources: An integrated digital twin solution.Engineering, Construction and Architectural Management, 33(8), 6094-6118. https://doi.org/10.1108/ECAM-04-2025-0604
- Zhou, Y., Tao, S., & Wu, S. (2025). Digital twin in the construction and application practice of the water diversion project from the Yangtze River to the Hanjiang River.China Water Resources, (23), 58-65.
- Jiang, S., & Chen, A. (2025). Research on the application of digital twin based on point cloud and BIM in intelligent management of construction project progress.Journal of Information Technology in Civil Engineering and Architecture, 17(6), 78-82. https://doi.org/10.16670/j.cnki.cn11-5823/tu.2025.06.14
- Kang, X., Luo, L., Lei, L., Zhang, Z., Zhu, B., & Liu, Y. (2025). Virtual simulation method for the construction process of cable-stayed-suspension bridge under complex wind fields based on digital twin.China Journal of Highway and Transport, 38(6), 84-95. https://doi.org/10.19721/j.cnki.1001-7372.2025.06.007
- Dai, J., Feng, Y., Yang, X., Jia, Y., Wang, Y., Wu, M., Zhao, H., Chen, X., & Wu, L. (2026). Development of a digital twin-based smart construction system for long-distance water supply projects under EPC model.Yellow River, 48(6), 130-135. https://doi.org/10.3969/j.issn.1000-1379.2026.06.019
- Le, L., Lu, L., Li, X., Lv, Y., Kou, X., & Ling, J. (2026). Digital twin technology for prefabricated assembly superimposed station based on BIM + IoT integration.Urban Mass Transit, 29(3), 59-65, 74. https://doi.org/10.16037/j.1007-869x.20240069