Stochastic Resource Constrained Project Scheduling Problem with Uncertain Resource Availability Based on Deep Reinforcement Learning
Abstract
In complex engineering projects such as aerospace, construction, and pharmaceuticals, project scheduling needs to optimize activity allocation under resource constraints, dynamic uncertainties, and activity interruptions. This paper focuses on the core challenge of project management in the context of intelligent manufacturing - the Stochastic Resource-Constrained Project Scheduling Problem with Uncertain Resource Availability (SRCPSP-URA). An end-to-end framework based on deep reinforcement learning (DRL) and dynamic graph attention network variant (GATv2) is proposed to solve SRCPSP-URA. A Markov decision process (MDP) model is developed for DRL to determine which activity to start at a stage. GATv2 is applied to extract complex and dynamic features from scheduling problems and provide them for policy network to create scheduling policy. DRL agent is trained and updated through the proximal policy optimization (PPO) algorithm to improve its decision-making performance. Computational results on benchmark datasets show that our DRL-GATv2 algorithm outperforms the widely used priority-rule heuristics in performance.
References
- E.L. Demeulemeester , W.S. Herroelen , Project Scheduling: A Research Handbook, Kluwer Academic Publishers, Norwell, MA, 2002.
- Veličković, Petar & Cucurull, Guillem & Casanova, Arantxa & Romero, Adriana & Lio, Pietro & Bengio, Y.. (2017). Graph Attention Networks. 10.48550/arXiv.1710.10903.
- Brody, Shaked & Alon, Uri & Yahav, Eran. (2021). How Attentive are Graph Attention Networks?. 10.48550/arXiv.2105.14491.
- Chen Zhi, Demeulemeester Erik, Bai Sijun, Guo Yuntao. Efficient priority rules for the stochastic resource-constrained project scheduling problem [J]. European Journal of Operational Research, 2018: S037722171830328X.
- Golab, A., Gooya, E., Falou, A & Cabon, M. (2022). Review of conventional metaheuristic techniques for resource-constrained project scheduling problem.Journal of Project Management, 7(2), 95-110.
- Li Haitao, Womer Norman K. Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming [J]. European Journal of Operational Research, 2015, 246(1): 20-33.
- Creemers S. Minimizing the expected makespan of a project with stochastic activity durations under resource constraints [J]. Journal of Scheduling, 2015, 18: 263-273.
- B Fang Xie A, C Haitao Li, D Zhe Xu. An Approximate Dynamic Programming Approach to Project Scheduling with Uncertain Resource Availabilities [J]. Applied Mathematical Modelling, 2021.
- P. Jędrzejowicz, E. Ratajczak-Ropel, Reinforcement Learning strategies for A-Team solving the Resource-Constrained Project Scheduling Problem, Neurocomputing, Volume 146, 2014, Pages 301-307.
- Teng Wang, Wei Cheng, Yahui Zhang, Xiaofeng Hu, Dynamic Selection of Priority Rules Based on Deep Reinforcement Learning for Rescheduling of RCPSP, IFAC-PapersOnLine, Volume 55, Issue 10, 2022, Pages 2144-2149.
- K.M. Sallam, R.K. Chakrabortty, M.J. Ryan, A reinforcement learning based multi- method approach for stochastic resource constrained project scheduling problems, Expert Syst. Appl. 169 (2021) 19.
- Golab, Amir & Sedgh Gooya, Ehsan & Falou, Ayman & Cabon, Mikael. (2022). A multilayer feed-forward neural network (MLFNN) for the resource-constrained project scheduling problem (RCPSP). Decision Science Letters. 11. 407-418.
- Golab, A., Sedgh Gooya, E., Al Falou, A., & Cabon, M. (2022). Investigating the performance of an artificial neural network for solving the resource constrained project scheduling problem (RCPSP). In Pattern Recognition and Tracking XXXIII. 12101, pp. 78-83. Florida: SPIE.
- Kun Lei, Peng Guo, Yi Wang, Xiao Wu, Wenchao Zhao, Solve routing problems with a residual edge-graph attention neural network, Neurocomputing, Volume 508, 2022, Pages 79-98.
- Park, Junyoung & Chun, Jaehyeong & Kim, Sang & Kim, Youngkook & Park, Jinkyoo. (2021). Learning to schedule job-shop problems: representation and policy learning using graph neural network and reinforcement learning. International Journal of Production Research. 59. 1-18.
- Min Zhang, Liang Wang, Fusheng Qiu, Xiaorui Liu, Dynamic scheduling for flexible job shop with insufficient transportation resources via graph neural network and deep reinforcement learning, Computers & Industrial Engineering, Volume 186, 2023, 109718, ISSN 0360-8352.
- Hongxia Cai, Yunqi Bian, Lilan Liu, Deep reinforcement learning for solving resource constrained project scheduling problems with resource disruptions, Robotics and Computer-Integrated Manufacturing, Volume 85, 2024, 102628.
- Cong Zhang, Wen Song, Zhiguang Cao, Jie Zhang, Puay Siew Tan, Xu Chi, Learning to dispatch for job shop scheduling via deep reinforcement learning, Adv. Neural Inf. Process. Syst. 33 (2020) 1621–1632.
- R. Kolisch, A. Sprecher, PSPLIB – a project scheduling problem library, Eur. J. Oper. Res. 96 (1997) 205–216.
- F. Ballestín , R. Leus , Resource-constrained project scheduling for timely project completion with stochastic activity durations, Prod. Oper. Manag. 18 (2009) 459–474.