Research on Investment Management Risks and Control Measures of Engineering Projects
Abstract
This paper centers on the critical themes of risks and corresponding control measures within project investment management, a domain vital to safeguarding investment returns and ensuring project success. It begins by thoroughly expounding the core aspects of systematic management methods, which serve as the foundational framework—specifically covering risk identification (the initial step to pinpoint potential hazards), scientific risk assessment and in-depth analysis (to quantify risk severity and impact), and targeted response strategies (to formulate proactive plans). On this basis, the study systematically sorts out six key categories of specific risks: those arising in the decision-making stage (e.g., flawed feasibility studies), market fluctuations, capital shortages or misallocation, policy adjustments, unpredictable external environmental changes (such as natural disasters), and inadequate management capabilities. It further analyzes how these risks interact to produce a superposition effect, amplifying potential losses. Finally, it proposes whole-process control measures across three key links—pre-risk prevention, in-process monitoring and control, and post-event response and mitigation—offering practical, actionable ideas to enhance the investment efficiency of engineering projects. Additionally, it looks ahead to the future trend of risk management amid digitalization, hinting at tech-driven advancements like data analytics for risk prediction.
References
- Li H. (2025) Risk Analysis and Control in Engineering Project Management. Chongqing Big Data and Artificial Intelligence Industry Association, Chongqing Construction Editorial Department, Chongqing Construction Association. Proceedings of the Academic Symposium on Smart Architecture and Intelligent Economic Development (Volume II). Shaanxi Water Development Group Nanzheng District Water Supply Co., Ltd.; 2025: 598-600.DOI: 10.26914/c.cnkihy. 026623.
- Peng S. (2021) Engineering Project Risk Management: A Review of Research. Sichuan Building Materials, 47(03): 180-182.
- Ren Y, Chen Z, Zhang Y. (2022) Risk Identification and Assessment of PPP Forestry Projects in China Using a Fuzzy Synthetic Evaluation Approach//Wuhan Zhicheng Times Cultural Development Co., Ltd..Proceedings of 4th International Conference on Business, Economics, Management Science (BEMS 2022). Yunnan Cancer Hospital & The Third Affiliated Hospital of Kunming Medical University & Yunnan Cancer Center; Faculty of Management and Economics, Kunming University of Science and Technology; Internatinal College, Yunnan Agricultural University, 2022: 356-381.DOI: 10.26914/c.cnkihy. 013170.
- Dziadosz A , Rejment M . (20125) Risk Analysis in Construction Project - Chosen Methods. Procedia Engineering, 122258-265.
- Tah M H J , Carr V . (2001) Knowledge-Based Approach to Construction Project Risk Management. Journal of Computing in Civil Engineering, 15(3): 170-177.
- Szymański, Paweł. (2017) Risk management in construction projects. Procedia engineering, (208): 174-182.
- Schieg M. (2006) Risk management in construction project management. Journal of Business Economics and Management, 7 (2): 77-83.
- Pan YH. (2025) Research on Risk Identification, Assessment and Control Strategies in Construction Project Management. Urban Architecture, 22 (02): 230-232. DOI: 10. 19892/j.cnki.csjz. 2025. 02. 58.
- Tah M H J, Carr V. (2001) Knowledge-Based Approach to Construction Project Risk Management. Journal of Computing in Civil Engineering, 15 (3): 170-177.
- Li HY. (2020) Full-process control measures for investment risk management in engineering projects. Mass Investment Guide, (12): 25-26.