Research Article

A Literature Review of the Iterated Greedy Algorithm in Permutation Flow-shop Scheduling Problems

Zihao Chen*
Shanghai University, No.99 Shangda Road, Shanghai, China

* Corresponding author: [email protected]

Abstract

This article is a literature review of iterated greedy (IG) applied to solving permutation flow-shop scheduling problem (PFSP) and distributed permutation flow-shop scheduling problem (DPFSP), which has profound and practical significance in job arrangement. Although various reviews of scheduling problems have been made, there are few review articles that focus on a certain algorithm. We first characterize the basic mathematical model of PFSP and DPFSP, as well as the Grantt chart to visualize a given solution. The article then provides a comprehensive review of the research development of IG applied in PFSP and DPFSP. In this progress, we focus on two major perspectives: (1) Classification and interpretation for the literature under a unified framework. (2) Unresolved issues and potential development based on a brief introduction of the algorithm. At the end of the review we also propose a brief introduction regarding the basic structure of iterated greedy algorithm. In the last part, the article leads a conclusion of the review and remark on the future development.

Keywords: Iterated greedy algorithm; permutation flow-shop scheduling; distributed flow-shop scheduling
Published: October 2, 2025
DOI: 10.54254/2755-2721/2025.LD27278
Volume: ACE Vol.184
pp. 77-89
Download PDF

References

  1. Ruben Ruiz and Thomas Stutzle. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 177(3): 2033–2049, MAR 16 2007.
  2. Ruben Ruiz, Quan-Ke Pan, and Bahman Naderi. Iterated greedy methods for the distributed permutation flowshop OMEGA-INTERNATIONAL scheduling problem. JOURNAL OF MANAGEMENT SCIENCE, 83: 213–222, MAR 2019.
  3. R.L. Graham, E.L. Lawler, J.K. Lenstra, and A.H.G.Rinnooy Kan. Optimization and approximation in deterministic sequencing and scheduling: a survey. In P.L. Hammer, E.L. Johnson, and B.H. Korte, editors, Discrete Optimization II, volume 5 of Annals of Discrete Mathematics, pages 287–326. Elsevier, 1979.
  4. Jose M. Framinan and Rainer Leisten. A multi objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria. OR SPECTRUM, 30(4): 787–804, OCT 2008.
  5. Michele Ciavotta, Gerardo Minella, and Ruben Ruiz. Multi-objective sequence dependent setup times per mutation flowshop: A new algorithm and a com prehensive study. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 227(2): 301–313, JUN 1 2013.
  6. HandeOztop, M.FatihTasgetiren, Deniz Tursel Eliiyi, Quan-Ke Pan, and Levent Kandiller. An energy efficient permutation flowshop scheduling problem. EXPERT SYSTEMS WITH APPLICATIONS, 150, JUL 15 2020.
  7. Damla Yuksel, M. Fatih Tasgetiren, Levent Kandiller, and Liang Gao. An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption. COMPUTERS & INDUSTRIAL ENGINEERING, 145, JUL 2020.
  8. Qiu-Ying Li, Quan-Ke Pan, Liang Gao, Hong Yan Sang, Xian-Xia Zhang, and Wei-Min Li. The constrained permutation flowshop problem: An effective two-stage iterated greedy algorithm to minimize weighted tardiness. SWARM AND EVOLUTIONARYCOMPUTATION, 91, DEC2024.
  9. Damla Yuksel, Levent Kandiller, and Mehmet Fatih Tasgetiren. Q-learning guided algorithms for bi criteria minimization of total flow time and makespan in no-wait permutation flowshops. SWARM AND EVOLUTIONARYCOMPUTATION, 89, AUG2024.
  10. Shih-Wei Lin, Kuo-Ching Ying, and Chien-Yi Huang. Minimizing makespan in distributed permutation flow shops using a modified iterated greedy algorithm. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 51(16): 5029–5038, AUG 1 2013.
  11. Victor Fernandez-Viagas and Jose M. Framinan. A bounded-search iterated greedy algorithm for the dis tributed permutation flowshop scheduling problem. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 53(4): 1111–1123, FEB 16 2015
  12. Xue-Lei Jing, Quan-Ke Pan, Liang Gao, and Yu-Long Wang. An effective iterated greedy algorithm for the distributed permutation flowshop scheduling with due windows. APPLIED SOFT COMPUTING, 96, NOV 2020.
  13. Jiang-Ping Huang, Quan-Ke Pan, and Liang Gao. An effective iterated greedy method for the dis tributed permutation flowshop scheduling problem with sequence-dependent setup times. Swarm and Evolutionary Computation, 59: 100742, 2020.
  14. Jia-yang Mao, Quan-ke Pan, Zhong-hua Miao, and Liang Gao. An effective multi-start iterated greedy algorithm to minimize makespan for the distributed permutation flowshop scheduling problem with preventive maintenance. EXPERT SYSTEMS WITH APPLICATIONS, 169, MAY 1 2021.
  15. Fernando Luis Rossi and Marcelo Seido Nagano. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. COMPUTERS & INDUSTRIAL ENGINEERING, 157, JUL 2021. 10th International Symposium on Intelligent Manufacturing and Service Systems (IMSS), Sakarya, TURKEY, SEP 09-11, 2019.
  16. Yuan-Zhen Li, Quan-Ke Pan, Jun-Qing Li, Liang Gao, and M. Fatih Tasgetiren. An adaptive iterated greedy algorithm for distributed mixed no-idle permutation flowshop scheduling problems. SWARM AND EVOLUTIONARYCOMPUTATION, 63, JUN2021.
  17. Yuan-Zhen Li, Quan-Ke Pan, Ruben Ruiz, and Hong Yan Sang. A referenced iterated greedy algorithm for the distributed assembly mixed no-idle permutation flowshop scheduling problem with the total tardiness criterion. KNOWLEDGE-BASED SYSTEMS, 239, MAR52022.
  18. Hui Zhao, Quan-Ke Pan, and Kai-Zhou Gao. A cooperative population-based iterated greedy algorithm for distributed permutation flowshop group scheduling problem. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 125, OCT 2023.
  19. Kasra Mousighichi and Mualla Gonca Avci. The distributed no-idle permutation flowshop scheduling problem with due windows. COMPUTATIONAL & APPLIED MATHEMATICS, 43(4), JUN 2024.
  20. B. Naderi and Ruben Ruiz. The distributed permutation flowshop scheduling problem. COMPUTERS & OPERATIONS RESEARCH, 37(4): 754–768, APR 2010.
  21. Shahriar Farahmand Rad, Rubén Ruiz, and Naser Boroojerdian. New high performing heuristics for minimizing makespan in permutation flowshops. Omega, 37(2): 331–345, 2009.
  22. Muhammad Nawaz, E Emory Enscore, and Inyong Ham. A heuristic algorithm for the m-machine, n-job f low-shop sequencing problem. Omega, 11(1): 91–95, 1983.
  23. Weibo Liu, Yan Jin, and Mark Price. A new improved neh heuristic for permutation flowshop scheduling problems. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 193: 21–30, NOV 2017.