Research Article

Application of Risk Assessment Methods in the Construction Phase of Large-Span Bridges

Wenhui Zhang*
School of Emergency Science and Engineering, Jilin Jianzhu University, Jilin, China

* Corresponding author: [email protected]

Abstract

The construction of large-span bridges represents the technological level of bridge construction in a country, and plays a positive role in the country's economic development and technological advancement. However, there are many problems in the construction of large-span bridges, such as wind vibration during the construction phase, management of personnel, equipment, and materials, and environmental impacts during the construction period. Applying risk assessment methods to the construction phase of large-span bridges can effectively solve these problems, and risk assessment provides scientific basis for bridge design optimization, construction decision-making, and operation and maintenance management, improving the safety and durability of large-span bridges, and has important theoretical value and practical significance for ensuring the sustainable development of bridge engineering. This article analyzes the application of three cutting-edge risk assessment methods in the construction phase of large-span bridges through examples. The current risk assessment methods still have certain limitations, and this article explores and reflects on the future development direction of risk assessment systems.

Keywords: Risk assessment; Large-span bridges; Applied research; Analytic hierarchy process; Fuzzy comprehensive evaluation
Published: July 24, 2025
DOI: 10.54254/2755-2721/2025.MH25468
Volume: ACE Vol.156
pp. 146-152
Download PDF

References

  1. Chen Wei, Wang Hailiang, Xiang Haifan A Brief Discussion on Wind Vibration Issues in the Construction of Long span Bridges. Journal of Shijiazhuang Railway Institute, 1998, (02): 79-82.
  2. Wang Feiqiu, Huang Jianling, Fu Jing, etc Safety risk assessment of high-speed railway bridge construction across existing lines based on BP neural network. Journal of Railway Science and Engineering, 2019, 16(5): 1129-1136.
  3. Huang Wei, Yuan Guangjie Bridge risk prediction model based on game theory and BP neural network. Western Transportation Technology, 2024, (04): 173-176.
  4. Zhu Cheng Risk assessment of bridge operation based on Analytic Hierarchy Process and Fuzzy Mathematics. Kunming University of Science and Technology, 2014.
  5. Yi Xiuhui Research on Construction Safety Risk Assessment of Large Span Bridge Engineering. Central South University, 2022.
  6. Tong Rongrong Bridge construction safety risk assessment based on Analytic Hierarchy Process. Heilongjiang Transportation Technology, 2025, 48(04): 126-129.
  7. Chang Dayong, Zhang Lili Fuzzy Mathematics Methods in Economic Management. Beijing: Beijing Institute of Economics Press, 1995: 56-71.
  8. Yousheng Cheng, Hani G.Melhem. Monitoring Bridge Health using Fuzzy Cased-based Reasoning. Advanced Engineering Informatics, 2005, 9(3): 299-315.
  9. Van Loargoven. A Fuzzy Extension of Saaty's Priority Theory. Fuzzy Sets and Systems, 1983, 11(3): 229-241.
  10. Li Guiyan Research on the Priority of Construction Safety Improvement in Rural Construction Projects Based on Grey Cluster Analysis. Harbin: Harbin Institute of Technology, 2021.
  11. Li Shibo Research and Application of Bridge Construction Safety Evaluation System Based on Fuzzy Comprehensive Evaluation Method. Transportation World, 2022, (31): 21-23.
  12. Common Mathematical Modeling Models (7): Fuzzy Comprehensive Evaluation Method: 2023-7-12. Retrieved from: https: //zhuanlan.zhihu.com/p/642976920.