Cost Control and Risk Management of Civil Engineering Construction Projects

Naiwen Hu*
Aulin College, Northeast Forestry University, Harbin, China, 150000

* Corresponding author: [email protected]

Abstract

The civil engineering industry is highly competitive and cost control and risk management are necessary. This paper focuses on the cost control and risk management of civil engineering construction projects. Although numerous cost control techniques and risk management frameworks have been developed, a notable gap remains between theoretical models and practical implementation. Key factors affecting cost control include material procurement, construction period, and personnel turnover. Measures can be taken in these three aspects to control costs. Risk management covers four links: risk identification, assessment, response, and monitoring, and a systematic approach is required to deal with risks. The effective combination of cost control and risk management, such as establishing a risk-driven cost control system, can enhance project benefits. To achieve comprehensive project management, it is necessary to construct a full-life cycle cost control framework and a risk matrix assessment mechanism. The combination of cost control and risk management ensures the success of the project.

Keywords: Cost control; risk management; engineering; construction projects
Published: July 11, 2025
DOI: 10.54254/2755-2721/2025.GL24902
Volume: ACE Vol.172
pp. 215-220
Download PDF

References

  1. Li, X., Wang, C., & Alashwal, A. (2021). Case Study on BIM and Value Engineering Integration for Construction Cost Control. Advances in Civil Engineering, 2021(1). https: //doi.org/10.1155/2021/8849303
  2. M. J. T. Amiri, F. Haghighi, E. Eshtehardian, and O. Abessi, “Multi-project time-cost optimization in critical chain with resource constraints, ” KSCE Journal of Civil Engineering, vol. 22, no. 10, pp. 3738–3752, 2018.
  3. Putri, W. H., & Setianan, A. R. (2019). Job enrichment, organizational commitment, and intention to quit: the mediating role of employee engagement. Problems and Perspectives in Management, 17(2), 518–526. https: //doi.org/10.21511/ppm.17(2).2019.40
  4. Liu, X., Liu, Q., & Li, Y. (2019). Finite-time guaranteed cost control for uncertain mean-field stochastic systems. Journal of the Franklin Institute, 357(5), 2813–2829. https: //doi.org/10.1016/j.jfranklin.2019.12.012
  5. Jung, W., & Han, S. H. (2017). Which risk management is most crucial for controlling project cost? Journal of Management in Engineering, 33(5). https: //doi.org/10.1061/(asce)me.1943-5479.0000547
  6. Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174–182. https: //doi.org/10.1016/j.proeng.2017.11.036
  7. Bahamid, R. A., Doh, S. I., Khoiry, M. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). The current risk management practices and knowledge in the construction industry. Buildings, 12(7), 1016. https: //doi.org/10.3390/buildings12071016
  8. Zhang, H. (2024). Financial Mathematics in Risk Management: Construction and optimization of quantitative models. Frontiers in Business Economics and Management, 17(1), 20–23. https: //doi.org/10.54097/hx4n4473
  9. Messore, M. M., Capacci, L., & Biondini, F. (2020). Life-cycle cost-based risk assessment of aging bridge networks. Structure and Infrastructure Engineering, 17(4), 515–533. https: //doi.org/10.1080/15732479.2020.1845752
  10. Tran, D. H., & Long, L. D. (2018). Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering Construction & Architectural Management, 25(5), 623–638. https: //doi.org/10.1108/ecam-05-2017-0085