The Impact of Digital Twin Technology on BIM Technology in the Building Life Cycle Analysis
Abstract
With the continuous development and improvement of civil engineering technology, BIM technology has been widely used in the building life cycle analysis, but data isolation is one of the serious problems in building life cycle, which limits the intelligent development of building facilities and the further application of BIM technology. Some researchers have found that the use of digital twin (DT) technology in combination with BIM technology can solve the problem of data isolation, but the combination of the two at various stages of the life cycle is on process. Therefore, by collecting the influence before and after the combination of DT technology and BIM technology in building facilities, this paper introduces, analyzes and summarizes, and probes into the three stages of design, construction and operation and maintenance respectively. It is found that the combination of BIM technology and DT technology can make the design more reasonable and elaborate in the design stage of building facilities; In the construction phase, it can make the construction facilitate collaboration, make the construction more safe and efficient; In the operation and maintenance stage, the operation and maintenance of the building can be more energy efficient, further save costs, and promote the sustainable and healthy development of the building.
References
- S. Honghong, Y. Gang, L. Haijiang, Z. Tian, and J. Annan, Automation in Construction 147, 104736 (2023).
- K. Figueiredo, A. W. A. Hammad, R. Pierott, V. W. Y. Tam, and A. Haddad, Journal of Building Engineering 97, 111018 (2024).
- E. N. Farsangi, A. O. Shehata, M. Rashidi, N. Ghassempour, and S. Mirjalili, Frontiers in Built Environment 10, (2024).
- T. D. Nguyen, and S. Adhikari, Sustainability 15(13), 10462 (2023).
- Y. Dong, S. T. Ng, and P. Liu, Sustainable Cities and Society 95, 104604 (2023).
- T. Säwén, A. S. Kalagasidis, and A. Hollberg, Renewable and Sustainable Energy Reviews 197, 114407 (2024).
- G. Gourlis, and I. Kovacic, Frontiers in Built Environment 8, (2022).
- S. Yoon, J. Lee, J. Li, and P. Wang, Automation in Construction 168, 105823 (2024).
- M. Guo, X. Wu, H. Qi, Y. Zhang, J. Chen, Y. Wei, X. Zhang, and X. Shang, Journal of Building Engineering 102, 111976 (2025).
- D. M. A. Morsi, W. S. E. Ismaeel, A. Ehab, and A. A. E. Othman, Ain Shams Engineering Journal 13(6), 101802 (2022).
- A. Sghiri, M. Gallab, S. Merzouk, and S. Assoul, Buildings 15(3), 498 (2025).
- P. Gordo-Gregorio, H. Alavi, and N. Forcada, Buildings 15(5), 811 (2025).
- V. Badenko, N. Bolshakov, A. Celani, and V. Puglisi, Sustainability 16(22), 9885 (2024).
- A. M. Abdelalim, A. Essawy, A. Sherif, M. Salem, M. Al-Adwani, and M. S. Abdullah, Sustainability 17(5), 1826 (2025).
- F. Jiang, L. Ma, T. Broyd, W. Chen, and H. Luo, Sustainable Cities and Society 78, 103645 (2021).
- P. Zech, S. Hammes, E. Goldin, D. Geisler-Moroder, R. Breu, and R. Pfluger, Energy and Buildings, 115184 (2024).
- D. -G. J. Opoku, S. Perera, R. Osei-Kyei, and M. Rashidi, Journal of Building Engineering 40, 102726 (2021).
- M. B. Shishehgarkhaneh, A. Keivani, R. C. Moehler, N. Jelodari, and S. R. Laleh, Buildings 12(10), 1503 (2022).
- R. Bortolini, R. Rodrigues, H. Alavi, L. F. D. Vecchia, and N. Forcada, Energies 15(19), 7002 (2022).