Research Article

Forecasting Walmart Store Weekly Sales Using Vector Autoregression with Exogenous Factors

Owen Chau1,*, Junfeng Liu2
1. College of Engineering, Northeastern University, Boston, MA 02120, USA
2. Xinhua College of Sun Yat-Sen University, Mainland China

* Corresponding author: [email protected]

Abstract

This paper, a model for predicting the sales of Walmart is demonstrated with the VARMAX technique (Vector Autoregression with Exogenous Factors). By incorporating sales data along with variables like holidays as well as economic indicators such as temperature fluctuations, fuel costs, CPI (Consumer Price Index) and unemployment rates, the Walmart’s weekly sales figures can be precisely forecasted by this model. Impressively, the performance metrics of thi model achieved an RMSE of 18, 961 and a MAPE of 4%, outperforming forecasting models such as ARIMA. Considering these influences, the model successfully recognized seasonal sales growth and considered economic changes that may affect consumer habit.

Keywords: Vector Autoregression; Exogenous; RMSE; MAPE
Published: April 21, 2025
DOI: 10.54254/2755-2721/2025.22207
Volume: ACE Vol.134
pp. 79-88
Download PDF

References

  1. Box, G. E., & Jenkins, G. M. (1970). "Time Series Analysis: Forecasting and Control." Holden-Day.
  2. Ailawadi, K. L., Gedenk, K., Lutzky, C., & Neslin, S. A. (2009). "Decomposition of the 2sales impact of promotion-induced stockpiling." Journal of Marketing Research, 46(3), 450-462.
  3. Hendry, D. F., & Mizon, G. E. (1993). "Evaluating dynamic models by encompassing the VAR." Econometrica, 61(4), 989-1002.
  4. Ashuri, B. , & Mostaan, K. . (2015). State of private financing in development of highway projects in the united states. Journal of Management in Engineering, 04015002.
  5. Kumar, L. , Jindal, A. , Velaga, N. R. , & Hayashi, Y. . (2018). Financial risk assessment and modelling of ppp based indian highway infrastructure projects.
  6. Akintoye, A. S. , & Macleod, M. J. . (1997). Risk analysis and management in construction. International Journal of Project Management, 15(1), 31-38.
  7. Au, S. K. , Wang, Z. H. , & Lo, S. M. . (2007). Compartment fire risk analysis by advanced monte carlo simulation. Engineering Structures, 29(9), 2381-2390.