Research Article

BIM technology and sustainable application development of green building under new evaluation standard

Hanrui Luan*
Jilin Jianzhu University, Changchun, Jilin, China

* Corresponding author: [email protected]

Abstract

Taking the integration of modern information technology and green building as the research background, we study the current status of BIM technology and green building development and application in the existing green building evaluation standard system, analyze the obstacles existing in the practical application of BIM technology in the whole life cycle of green building under the new global evaluation standard, and point out the direction of further research. The results of the study show that at this stage, BIM technology and green building-related regulations and systems are not yet sound, the evaluation standard system is not yet perfect, and there is a lack of organic synergy between each other,"Siloing" at certain points throughout the life cycle of a building. Green buildings are far away from the development and application of BIM technology and green buildings. The phenomenon of "isolated" in some stages of the whole life cycle of the building, some links appear as an "island" phenomenon, there is still a gap between green building and comprehensive coverage, and the widespread application of BIM technology needs to be promoted. In the future, the application research on sustainable development of green buildings based on BIM should be committed to further improve the relevant regulations, systems, and evaluation standards, create a core database of all relevant information in each stage of the whole life cycle of the building, realize the interactive sharing of information, implement the BIM integrated application mode, give full play to the advantages of the whole life cycle and integrated management of BIM, and integrate BIM technology with green building in a deeper way.

Keywords: Building Information Modelling; Green Building; Sustainable development; applications
Published: August 31, 2024
DOI: 10.54254/2755-2721/89/20241069
Volume: ACE Vol.89
pp. 40-46
Download PDF

References

  1. Ding, S. Z. (2005). Introduction to informatization of construction engineering. China Architecture & Building Press.
  2. Tan, X. D., Wu, X. W., & Yang, K. (2023). Research on performance analysis of green building based on BIM technology. Industrial Construction, 53(S2), 89-90. https://mall.cnki.net/magazine/Article/GYJZ2023S2020.htm
  3. Eastman, C. (1975). The use of computers instead of drawings in building design. AIA Journal, 63(3), 46-50. https://www.researchgate.net/profile/Charles-Eastman/publication/234643558
  4. Laiserin, J. (2002, December 16). Comparing pommes and naranjas. The Laiserin Letter. https://www.laiserin.com/features/issue15/feature01.php
  5. Guo, H. L., Li, H., & Skitmore, M. (2010). Life-cycle management of construction projects based on virtual prototyping technology. Journal of Management in Engineering, 26(1), 41-47. https://doi.org/10.1061/(ASCE)0742-597X(2010)26:1(41)
  6. McGraw-Hill Construction. (2008). Building information modeling: Transforming design and construction to achieve greater industry productivity. McGraw-Hill Construction.
  7. Zheng, H. H., Liu, Y., & Li, Y. Q. (2015). A review of research and application of the BIM technology. Structural Engineers, 31(4), 233-241. https://doi.org/10.15935/j.cnki.jggcs.2015.04.033
  8. Zhao, Q., Tian, Q., Liu, Y. H., & Hei, X. H. (2017). BIM technology application of construction management under a new assessment standard for green building. Journal of Xi'an University of Technology, 33(2), 211-219. https://doi.org/10.19322/j.cnki.issn.1006-4710.2017.02.015
  9. Zhu, L. J. (2017). The impact and countermeasures of BIM technology on the cultivation of engineering costing professionals in higher vocational colleges and universities. Modern Economic Information, (15), 82-83. https://doi.org/10.3969/j.issn.1001-828X.2017.22.352
  10. Yang, C. G. (2018). Integrated application of green building design and construction based on BIM technology. Automation and Instrumentation, (12), 226-228. https://doi.org/10.14016/j.cnki.1001-9227.2018.12.226
  11. Liu, K. Y., & Tian, H. F. (2014). Optimization of green building design process on the basis of evaluation standards for green building. Construction Technology, 43(4), 60-62. https://doi.org/10.7672/sgjs2014040060
  12. Lu, W. W. S., & Li, H. (2011). Building information modeling and changing construction practices. Automation in Construction, 20(2), 99-100. https://doi.org/10.1016/j.autcon.2010.09.006
  13. Zhang, J. X. (2010). Study on barriers to implementing BIM in the engineering design industry in China. Journal of Engineering Management, 24(4), 387-392. https://doi.org/10.3969/j.issn.1674-8859.2010.04.008
  14. He, Q. H., Qian, L. L., Duan, Y. F., & Li, Y. K. (2012). Current situation and barriers of BIM implementation. Journal of Engineering Management, 26(1), 12-16. https://doi.org/10.3969/j.issn.1674-8859.2012.01.003